1. Dashboard
  2. Articles
    1. FamilyCruise
    2. etwas MEERzeit
    3. Kreuzfahrtnews
      1. News als Video
      2. News auf Instagram
      3. News auf Facebook
      4. News auf X (deutsch)
      5. News on X (english)
      6. News auf BlueSky
      7. News auf Threads
  3. Reedereien & Schiffe
    1. AIDA Cruises
    2. TUI Cruises
    3. Disney Cruise Line
    4. MSC Cruises
    5. Carnival Cruise Line
  4. Socialmedia
    1. Youtube: /@hafenzeitkiel
    2. Twitch: hafenzeitkiel
    3. Instagram: hafenzeitkiel
    4. Youtube: /@etwasmeerzeit
    5. Twitch: etwasmeerzeit
    6. Instagram: etwasmeerzeit
    7. facebook.com/someseatime
    8. TikTok/@etwasmeerzeit
    9. Kick.com/etwasmeerzeit
    10. X/etwasmeerzeit
    11. ICH KAUFE DEIN VIDEO - DE
  5. Shipspotting Cams
  6. Forum
  7. Shop
  8. Impressum
    1. Kontakt
    2. Datenschutzerklärung
    3. Disclaimer Shop
    4. eMz Cloud
    5. eMz E-Mail
  • Login
  • Register
  • Search
Kreuzfahrtnews
  • Everywhere
  • Kreuzfahrtnews
  • Articles
  • Pages
  • Forum
  • More Options
  1. etwas MEERzeit
  2. Articles
  3. Kreuzfahrtnews

Cruise Port Eidfjord: Quay Wall Expansion Completed for Green Future

  • etwas MEERzeit
  • May 23, 2026 at 9:41 AM
  • 435 Views
  • 0 Replies
Von rheins, CC BY 3.0, Link
On May 22, 2026, the Norwegian cruise port of Eidfjord successfully completed the expansion of its quay wall. The pier was extended by exactly 40 meters to a total length of 160 meters. With this move, the small municipality in the Hardangerfjord is responding to the massive growth in passenger numbers over the past two decades. The expansion allows large cruise vessels to dock safely and securely. The time-consuming tendering process, which required ship engines to run continuously while at anchor, is now a thing of the past, significantly relieving the fjord's fragile ecosystem.

All news also on X formerly Twitter

At the same time, the port optimized its onshore logistics. Newly established, color-coded traffic zones strictly separate pedestrians from bus operations. This unbundles visitor flows, minimizes the risk of accidents, and ensures barrier-free access to local attractions such as the Vøringsfossen waterfall. Cruise lines are actively supporting this local direction: smaller, environmentally friendly ships like Ambassador Cruise Line's Ambition already call at the port and participate in local environmental initiatives.

Above all, the extension of the quay wall serves as the foundation for the next major project: a state-of-the-art shore power facility with a capacity of 12 MVA. Starting in April 2027, it will supply docked cruise ships entirely with green electricity from the Norwegian grid. This allows vessels to completely shut down their onboard generators during their stay, reducing local emissions at the berth to zero. The project is backed by the state-owned enterprise Enova with a maximum grant of 20 million NOK.

For the construction and operation of the facility, Plug Eidfjord AS was established as a public-private partnership. The municipality retains full ownership of the quay infrastructure but brings the grid expertise of the energy giant Eviny on board through the joint venture. Strategically, this investment is vital for Eidfjord: given the strict zero-emission regulations in neighboring World Heritage fjords, the port is securing its place among the green leaders and remains highly attractive to the world's most modern fleets.

Previous Article AIDAmar Dry Dock Stay 2026: Cruising with Passengers in the Dry Dock

Next Article Costa Cruises 2027: The New "Sea Destinations" Concept in the Mediterranean

Discussion Thread 0 replies
  1. Privacy Policy
  2. Disclaimer Shop
  3. Contact
  4. Legal Notice
Powered by WoltLab Suite™
Style: »Horizon« by Elevenfour