1. Dashboard
  2. Articles
    1. FamilyCruise
    2. etwas MEERzeit
    3. Kreuzfahrtnews
      1. News als Video
      2. News auf Instagram
      3. News auf Facebook
      4. News auf X (deutsch)
      5. News on X (english)
      6. News auf BlueSky
      7. News auf Threads
  3. Reedereien & Schiffe
    1. AIDA Cruises
    2. TUI Cruises
    3. Disney Cruise Line
    4. MSC Cruises
    5. Carnival Cruise Line
  4. Socialmedia
    1. Youtube: /@hafenzeitkiel
    2. Twitch: hafenzeitkiel
    3. Instagram: hafenzeitkiel
    4. Youtube: /@etwasmeerzeit
    5. Twitch: etwasmeerzeit
    6. Instagram: etwasmeerzeit
    7. facebook.com/someseatime
    8. TikTok/@etwasmeerzeit
    9. Kick.com/etwasmeerzeit
    10. X/etwasmeerzeit
    11. ICH KAUFE DEIN VIDEO - DE
  5. Shipspotting Cams
  6. Forum
  7. Shop
  8. Impressum
    1. Kontakt
    2. Datenschutzerklärung
    3. Disclaimer Shop
    4. eMz Cloud
    5. eMz E-Mail
  • Login
  • Register
  • Search
Kreuzfahrtnews
  • Everywhere
  • Kreuzfahrtnews
  • Articles
  • Pages
  • Forum
  • More Options
  1. etwas MEERzeit
  2. Articles
  3. Kreuzfahrtnews

Queen Mary 2: Planned Stop in Bremerhaven Due to Propulsion Damage – Docks at Container Terminal

  • etwas MEERzeit
  • November 17, 2025 at 11:35 AM
  • 1,735 Views
  • 0 Replies
Von DerHexer, Wikimedia Commons, CC-by-sa 4.0, CC BY-SA 4.0, Link
The Cunard Line flagship, the "Queen Mary 2", docked in Bremerhaven as scheduled this morning (November 17, 2025). However, this was not a routine port call, but the result of a diversion that was communicated last week. Due to a technical defect in a propulsion pod, the ship had to call at the port on the Weser estuary instead of Hamburg—and is now docked at a highly unusual location.

All news also on X formerly Twitter

The "Queen Mary 2" completed a 10-night European cruise today. The original destination port was Hamburg. However, as announced last week, a technical problem forced the shipping line to take action. Instead of Hamburg, the 345-meter vessel arrived in Bremerhaven at 01:07 UTC.

As confirmed by the Cunard Line, a "technical defect in a propulsion pod" is the cause of the diversion. These so-called pod drives are central to the ship's maneuverability. They can rotate 360 degrees and combine the motor and propeller in an external gondola.

A defect in one of these "Mermaid" pods significantly impairs steering capability and propulsion redundancy. For those familiar with the ship, this is not new: the "Queen Mary 2" has repeatedly struggled with problems in these complex systems for years. A major overhaul of the pods took place back in 2016. The current problem is thus the recurrence of a known, chronic issue.

The decision against Hamburg and in favor of Bremerhaven—even though made in advance—was a mandatory nautical consequence of the damage.

  • Risk on the Elbe: The approach to Hamburg requires a multi-hour, complex passage on the tide-dependent and heavily trafficked Elbe River. Steering a ship of this size with compromised maneuverability in this narrow fairway poses an extreme risk.
  • Alternative Bremerhaven: The port on the Weser estuary, in contrast, is directly accessible from the North Sea. The approach is short, deep, and nautically far less complicated. Furthermore, Bremerhaven has the necessary shipyard infrastructure for a potential inspection or emergency repair.

The full extent of the incident is evident at the berth, despite the scheduled arrival. The "Queen Mary 2" is not docked at the cruise terminal (Columbuskaje), but had to tie up at the Stromkaje—one of Europe's largest container terminals.

This is an absolute first and underscores the seriousness of the technical problem. At the Stromkaje, there is zero infrastructure for passengers:

  • No passenger gangways for a ship of this height.
  • No terminals for customs or baggage handling.
  • No waiting areas.

The ship is docked in the middle of an active, high-security industrial area. Nautical safety took absolute priority over any passenger logistics when planning this call.

The incident triggers a cascade of problems for travelers, even though they were already informed:

  1. Disembarking Guests: The 420 passengers who were supposed to end their journey in Hamburg were informed of the change. They must now, however, disembark under logistically difficult conditions at the container terminal. Cunard is organizing the previously announced bus transfer to take guests and their luggage to Hamburg, about 100 km away.
  2. Canceled Short Cruise: The situation is also severe for the passengers of the next voyage (M535B). This 2-night short cruise from Hamburg to Southampton is canceled. The affected passengers were also informed last week.
  3. Transatlantic Crossing in Jeopardy: The domino effect could also hit the ship's most important route. The canceled short cruise was necessary to reposition the ship to Southampton. From there, it was scheduled to depart in just two days (November 19) for the transatlantic crossing to New York. A defect in a propulsion pod is often not a quick fix. It is highly unlikely that the ship will be seaworthy in time.

For Cunard, this incident—even though communicated early—means a massive financial and logistical effort, as well as significant damage to its reputation. Reliability is the greatest asset of an ocean liner—and that is now once again in question.

Previous Article Traumschiff 2025/2026: New Episodes, New Strategy – All Info on the Holiday Trilogy

Next Article Royal Caribbean Conquers Texas: Icon of the Seas Arrives in Galveston in 2027

Discussion Thread 0 replies
  1. Privacy Policy
  2. Disclaimer Shop
  3. Contact
  4. Legal Notice
Powered by WoltLab Suite™
Style: »Horizon« by Elevenfour